October 31, 2026
The Local Echo

Local news from public records, city by city

TransportBurnaby

Laneway south of Hastings closed for construction until December 26

A traffic control permit covers the laneway south of Hastings between Esmond Ave and Ingleton Ave from October 31 to December 26.

A construction traffic control permit (TC26-01648) is in effect for the laneway south of Hastings Street, between Esmond Avenue and Ingleton Avenue. It runs from October 31 to December 26.

The closure applies daily from 0700 to 1700. The city's record describes it as a partial lane closure for construction use, and also lists a full road closure. The laneway is not on a bus route. The permit is approved, with no parking service or noise variance required.

Facebook X WhatsApp Email

Sources

  • Construction traffic control on Laneway south of Hastings st between Esmond Ave and Ingleton Ave (TC26-01648)

This story was checked against the sources above before publishing. Editorial policy · Report an error