November 5, 2026
The Local Echo

Local news from public records, city by city

Lions Gate Bridge centre lane closed for road maintenance

DriveBC lists a minor road maintenance closure of the centre lane on the Lions Gate Bridge in both directions, starting November 5.

Lions Gate Bridge (First Narrows Bridge) 1
“Lions Gate Bridge (First Narrows Bridge) 1” · Photo by Xiao23 / Wikimedia Commons, CC BY-SA 3.0

The centre lane of the Lions Gate Bridge is closed for road maintenance, according to a DriveBC event posted at 10:18 a.m. on November 5. The closure applies in both directions and starts in West Vancouver. DriveBC rates the event as minor. No end time is given in the listing. Current conditions are available at drivebc.ca.

Facebook X WhatsApp Email

Sources

Contains information licensed under the Open Government Licence – North Vancouver.

This story was checked against the sources above before publishing. Editorial policy · Report an error